Aelyik yonggi suipgwa yutong-eul wihan gisul gaideu-wa jebo sinhak. HM Tanks-ui gisul tim-i jejak — 2019-buteo gongjang jikjeob aelyik tank jejaga.
Gisul Gaideu
📅 2026nyeon 7wol 10il
✍️ HM Tanks Gisul Tim
⏱️ 12 bun
Pye swilo haidulonik nanbang system-ui olbareun hwakjang tank keugi-reul gyesanhagi wihan dan gye-joh gisul gaideu. Suryong, system yongnyang chujeong, chungjeon alyeok mich bangi beolbeo seoljeong-eul daeubnida — jutagek mich sangyong sijol-e daehan silje ye-reul deureo.
Injeung
📅 2026nyeon 7wol 17il
✍️ HM Tanks Pumjil Tim
⏱️ 10 bun
Junggug-eseo aelyik yong-gi-reul jodarhaneun gukje maesu-ja-reul wihan ASME Boiler and Pressure Vessel Code (BPVC) injeung-e dAEhan pogwaljeog-in gaideu. ASME Section VIII Division 1 yogu-sahang, U-Seuteompeu-wa UM-Seuteompeu cha-i, gwanse cheongsan-eun pil-yohan seoryu, mich gong-geub-ja ASME jagyeog-eul hwag-in-eun bangbeob-eul daeubnida.
Gmae-ja Gaideu
📅 2026nyeon 7wol 24il
✍️ HM Tanks Jepeum Tim
⏱️ 11 bun
Peullasutik, gangcheol mich peullaseutil yeoktung-ab jeojang tank-ui sangse-han bigyo. Jaejong teugseong, FDA jungseon, alyeog deungi, gyeongmag gisul, biyong bunseog mich jutagek, sang-yong mit saneob-yong RO system-e daehan yongjeong teug-byel.
Gongjang Tyeo
📅 2026nyeon 7wol 31il
✍️ HM Tanks Gisul Tim
⏱️ 8 bun
Aelyik tank-ga jejo-doeneun gwajeong-eul mulos-eseo boyeojunbida — wongangcheol coil-buteo wanlyo dulyeomuhn. 7-danje saengsan gwajeong-eul daeubeu kye: jil gwel jil, nagik mog kyeong hyung malng, goem, pyomyen, johlib dui, alyeok siheomaej h gwoam. Linyi-e issneun 40,000 pingbangmiteoeui gongjang-e dinyeogaedwae.
Technical Guide
📅 July 4, 2026
✍️ HM Tanks Engineering Team
⏱️ 10 min read
Step-by-step engineering guide to calculating the correct air receiver tank size. CFM-based sizing formula, worked example for manufacturing plant, vertical vs horizontal selection, material comparison, and ASME requirements — with a quick-reference sizing table for compressors from 10 to 500 CFM.