OEM & ODM Pressure Tank Manufacturing

Your brand. Our factory. We manufacture pressure tanks, expansion vessels, RO storage tanks, and air receivers with your logo, your colors, and your specifications — shipped directly to your warehouse or your customers.

Why HM Tanks for OEM/ODM?

CapabilityHM TanksIndustry Typical
Production lines20+ dedicated lines5–10 lines
Daily output15,000 PCS3,000–5,000 PCS
Factory area40,000 m²10,000–20,000 m²
CertificationsISO 9001, CE, NSF, ASME, RoHSTypically 1–2 certs
Export countries120+20–50
In-house toolingYes — mold design & fabrication on-siteOften outsourced
Dust-free workshopYes — dedicated RO tank clean roomRare

Customization Options

Branding & Appearance

Product Specifications

Packaging & Documentation

OEM vs ODM: What Is the Difference?

OEM (Original Equipment Manufacturing)ODM (Original Design Manufacturing)
Who designs?You provide the design/specificationWe design based on your requirements
Best forEstablished brands with existing product specsNew brands entering the market
Tooling costYou pay for custom molds/toolingShared or amortized tooling cost
Lead time25–45 days (after sample approval)15–30 days (using existing platform)
Minimum order100–500 units (varies by customization)100–300 units
ExclusivityYour design is yours — we do not sell to othersPlatform shared; your branding is exclusive

The OEM/ODM Process

1

Inquiry & Requirements

You tell us what you need — product type, target specifications, budget, timeline, and target market. We provide a preliminary feasibility assessment and budget estimate within 24 hours.

2

Design & Engineering

Our engineering team creates or reviews the product design, including 3D CAD models, material specifications, and compliance mapping (which certifications apply to your target market).

3

Sampling (7–15 Days)

We produce pre-production samples for your approval. Samples include your chosen branding, color, and packaging. You can request modifications before mass production begins.

4

Mass Production (15–45 Days)

After sample confirmation, full production begins. In-line QC inspection at every stage. Batch sampling and testing per your requirements and applicable standards.

5

Final Inspection & Shipping

Pre-shipment inspection (we welcome third-party inspectors). FOB Shanghai — we handle export documentation including certificate of origin, bill of lading, and certification documents under your brand name.

Quality Control — Every Tank, Every Time

Frequently Asked Questions

What is the minimum order quantity (MOQ)?

100–500 units depending on the product type and level of customization. Contact us with your specifications for a precise MOQ.

Can I use my own mold design?

Yes. For plastic RO tanks, we can fabricate custom injection molds to your design. Mold fabrication takes 15–30 days. The mold belongs to you and is stored at our facility for your exclusive production runs.

Do you provide samples before mass production?

Yes. Pre-production samples are provided within 7–15 days. Sample cost is credited against your production order.

Can you ship directly to my customers (drop shipping)?

Yes. We offer white-label shipping — your branded products, your packaging, shipped under your company name. FOB Shanghai or door-to-door service available.

What certifications can you provide?

Depending on your target market: ASME U-Stamp (North America), CE/PED (European Union), NSF (water safety), plus standard ISO 9001 and RoHS compliance documentation. All certification documents can be issued under your brand name.

How do I get started?

Email us at info@huimay.cn with your product requirements, target market, and estimated order quantity. Our OEM team will respond with a preliminary proposal within 1 business day.

Ready to Build Your Brand?

Tell us what you need. We will send a detailed proposal with pricing, timeline, and certification options — typically within 24 hours.

Request a Quote →